Tristate Machinery Dismantlers Forum   >   MICHIGAN   >   Elh series high purity hydrogen generator elh-2L

Elh series high purity hydrogen generator elh-2L


1 Characteristics of the Instruments
1 It is so simple to operate the instruments that hydrogen can be produced just after opening the switch. The pressure of released hydrogen is steadily, and the flow is digitally displayed with LED, which is more ocular and more striking.
2 It is so simple to operate the instruments that hydrogen can be produced just after opening the switch. The pressure of released hydrogen is steadily, and the flow is digitally displayed with LED, which is more ocular and more striking.
3 The liquid storing, hydrogen electrolyzing and desorbing are integrated together in the instruments with large electrolyzing area, low temperature of the pool, long service life, large amount and high purity of produced hydrogen.
4 The instruments are specially installed with the devices that can prevent liquid from returning, so the instruments can be effectively guaranteed that the phenomenon of liquid returning doesn t occur during operation. As a result, the discolor silica gel is not often to be changed.
5 The adoption of the advanced switch powers can improve the electrolytic efficiency.
6 The instruments substitute the high-pressure steel bottles, and make the laboratory instrument.
2. Operating Method and On-line
1 First, please check whether there is unusual phenomenon such as the serious damage on the surface or inside of the instruments caused from transportation. And then check whether the fittings are complete according to the manual.
2 Compounding the electrolyte: Dilute 140g KOH with deionized or distilled water of 400ml. After cooling, fill the solution into the liquid container of 1.5 liters in the upper of the instrument. Then fill deionized or distilled water into the container until the liquid surface reaches the level of H.
3 Screw the sealing cap off the output exit on the back board of the instrument to make the hydrogen outlet unblocked.
4 Put on the power and the flow display of the instrument should be the value as below, ELH-1L type 0 ~ 1000 ml/min, ELH-2L type 0 ~ 2000 ml/min,ELH-5L type 0 ~ 5000 ml/min.
(5) After starting the instrument normally, tighten up the sealing cap to the output exit to assure it sealed and cut off the outlet way of hydrogen.
(6) If the pressure display is 0. 5MPa, and the digital LED display of flow is 000 or close to 000 after started the machine for 3 minutes, it shows the instrument is normal; Otherwise it shows the instrument leaks gas. In the case of leakage, check the instrument with suds and exclude from leaking trouble.
(7) Cut off the power, and take down the sealed cap of output exit. Connect the pipeline of the external diameter of 3mm with the instrument, and assure there isn t any leakage, then hydrogen can be supplied normally.
(8) Each time after operation, you just need to cut off the switch. Next time to operate, you just need to switch on.
(1) Observe the discolor silica gel from the side, and change it according to the need. While changing, cut off the power first. After the display of pressure has been zero, screw down the desiccator in clockwise direction and invert it, then screw down the upper cover in counterclockwise direction and change the discolor silica gel. Finally, install them again according to the above process and assure sealing.
(2) The LED display value is only for reference because it is converted from the electrolytic electric current. Hydrogen flows out after the buffering of the purifying tube, so the flow is relatively steady, and the changes of 1 at the tenth figure number of the flow display are normal.
(3) It is distilled water but not KOH that is consumed while the operating of the instrument. Deionized water or distilled water should be supplemented according to the situation to assure the electrolyte location is between the upper and lower line. It is proposed that the electrolyte should be changed once every 6 ~ 7 months.
(4) If find that the manometer pointed out pressure is low, or the digital display figure show bigger than at ordinary times, this is arising from leaking gas. Man should check the situation of leaking gas in an all-round way with the soap liquid. While changing the discolor silica gel, should pay special attention to screwing on in the sealed place of upper and lower whorl.
Our company sells all kinds of Ozone Generators, Oxygen Generator and other gas generator.
Welcome any distributor to contact us!



Elh series high purity hydrogen generator elh-2L