Tristate Machinery Dismantlers Forum   >   STATE OF IOWA   >   Electrical Components   >   Used   >   Powermanager lts load shedding automatic transfer

Powermanager lts load shedding automatic transfer


The PowerManager LTS is designed to allow the most efficient use of the generator by monitoring and managing the backed up selected and non-selected circuits. If the generator approaches overload condition, the non-selected circuits are cycled off, allowing the selected circuits to remain powered. This switch is designed to operate with the digital controls that are used on air-cooled and liquid-cooled generators from 8 kW through 45 kW.
The LTS is housed in an aluminum NEMA 3R enclosure. It is service entrance rated at 200 amps and also has a built in 16 circuit priority load center. The main contactor protects the selected priority circuits while the secondary contactor protects the remaining, non-selected circuits located in the existing electrical panel. The cover is side hinged for easy access.
The transfer switch contactor is rated at 250 VAC and is available in single phase configuration only.
Utility coil voltage drop-out.....................................................................................................................................................................<60%
Standby coil voltage sensor.....................................................................................................................................................................90%
Utility coil voltage pickup........................................................................................................................................................................>80%
Load shed activation...................................................................................................58 Hz for >3 seconds or below 50 Hz for <1/2 second
Automatic load return.....................................................................................................................................................................Adjustable
TRANSFER SWITCH & PRIORITY LOAD CENTER
Utility Voltage Monitor (fixed)
Exerciser weekly for 12 minutes
Total of Pre-wired Circuits in Priority Load Center



Powermanager lts load shedding automatic transfer Powermanager lts load shedding automatic transfer